Crack Fill

Product Info:


Crack Fill solution is a ready-to-use flexible putty for filling cracks in interior or exterior plastered and structurally cracked surfaces. It's a flexible paint mixture that not only fills cracks but also prevents them from reappearing, maintaining a smooth, "as fresh and new" finish. It works as a water-repellent glue in constructions. In nature, it is non-shrinking and displays strong strength and durability in all weather conditions. It acts as a surface leveler, which helps to reduce the amount of paint used. The ultimate result is a surface that is uniform, smooth, and buttery.

Crack Fill
Ashirbad Paints Ashirbad Paints Ashirbad Paints Ashirbad Paints Ashirbad Paints Ashirbad Paints Ashirbad Paints Ashirbad Paints
Technical Characteristics The Product
Composition Acrylic copolymer and additives
Specific Weight 1 kg/ltr ± 0.05
pH >7
Appearance Milky white coloured free flowing liquid.
Viscosity 12±1 sec (as per B4 Cup)
Shelf Life 12 months from date of manufacture in original tightly closed containers away from direct sunlight.
Storage Store in dry cool place in the temperature range from 5OC to 30OC in sealed condition. Do not allow to freeze. Keep away from direct sunlight.
Fire Reaction Negative when applied onto not flammable surfaces.
Technical Characteristics Application
Coverage 20 ~ 25 sqft/ltr/coats
**Actual coverage may vary due to application method and surface roughness.**
Application Tools Brush, Roller, Spray
(1.7mm nozzle), Roller
Application Temperature +10OC ~ +40OC (When relative humidity not over 75%)
Drying Time Surface dry - 4 hrs
Hard dry - 8 hrs
Fully cured – 24 ~ 72 hrs
(temperature = +20OC with relative humidity not above 75%)

Important:

Damp Care is an acrylic based Polymer Modified Cementitious Flexible Composite coating system. It is used for surface treatment, protecting, waterproofing and repairing concrete and masonry.

Waterproofing of toilets, terraces, roofs etc.

Surface to be waterproofed should be dry, free from grease, dirt, dust or all kinds of loose particles. All surface imperfections should be leveled.

Polymer is mixed with neat fresh cement in the ratio of 1:2 by weight. The mix has to be stirred thoroughly until smooth homogeneous slurry is obtained. Wait for 5-10 minutes to release entrapped air bubbles. Any lump found in the mix should be removed or mixed thoroughly. The mix has to be applied by brush on rendered and/or prepared surface. Two or more coats are recommended. First coat should be allowed to air dry for 5-6 hours prior to apply subsequent coat.

Store the container in cool & dry place. Keep out of the reach of children and away from food, drink and animal feed. May be harmful if swallowed. In case of ingestion seek immediate medical attention. Ensure good ventilation at all times.

Pre Painting Process:

  • PLASTER New masonry surfaces must be allowed to cure completely. It is recommended to allow 28 days as the curing time for new masonry surfaces.
  • CLEANING Surface should be free from any loose paint, dust or grease. Growths of fungus, algae or moss should be removed by wire brushing and water. In case of areas having excessive dampness use Ashirbad Paints Damp Care to limit further dampness.
  • FILLING FOR CRACKS For filling cracks upto 3mm use Ashirbad Paints Crack Fill Paste.
  • FILLING FOR HOLES & DENTS In case of dents and holes use Ashirbad Paints Acrylic Wall Putty or white cement and fine sand in the ratio 1:3
    For interior surfaces or substrates that are subjected to continuous seepage or dampness, kindly use Ashirbad Paints Damp Care before the top coat application.
  • Paint Application Process:
    Step 1 Sanding
    Step 2 Ashirbad Cement Primer Brush / Roller / Spray
    Step 3 Ashirbad Acrylic Wall Putty Putty Knife
    Step 4 Sanding
    Step 5 Ashirbad Cement Primer Brush / Roller / Spray
    Step 6 Sanding
    Step 7 First Coat Emulsion Paint Brush / Roller / Spray
    Step 8 Second Coat Emulsion Paint Brush / Roller / Spray
    To ensure proper surface preparation before painting.
    No loose material on surface.
    • Ensure covarage does not exceed by more than 10% recommended figure.
    • Insist dilution of paint as per paint manufacturer’s recommendation.
    • Insist on proper crack filling & re-plastering loose plaster before painting.
    • Insist on proper water proofing before start of painting.
    • Insist on recommended no. of primer & top coats.
    For longer life of paint.
    • Insist on 3 coats for horizontal surfaces on exteriors.
    • Insist on bio-wash treatment to kill Algae/Fungus infestation.
    • Insist on high quality paints.
    • Avoid cementations paints on smooth exteriors surfaces.
    • Insist on 100% acrylic paints in high rainfall areas.
    • Do not paint wet or newly plastered surfaces with visible moisture.
    • Allow enough time for curing and drying.
    • Do not attempt interior painting during heavy rain and high humidity.
    • Postpone exterior paint during rain & when it is likely to rain within 4 hours of painting.
    • Do not speed up the recommended painting process. Give enough drying time between coats.
    • Do not use Universal Stainers for tinting exterior shades.
    • Do not paint during the atmospheric temprature is below 15O C and above 40O C and Humidity 80-85%.
    • Do not cure any paint with water.
    • Do not use any type of spray plaster or POP or interior putty under exterior paints.

    Contact Us

    We are here to help!

  • Corporate Office:


    Shankhamul-10, Kathmandu, Nepal

    01-5242140
  • Branch Office:


    Prabhat Path, Bhairahawa, Nepal

    071-573974
  • Factory:


    Nepalgunj Industrial Estate-13, Banke, Nepal

    081-531193